

Each piece is carved from wood and handpainted to provide a piece you’ll love. Length – 20 inches. US Veteran Owned Business. The product is not intended to be used by children 12 years and younger. The building contract was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut on 30 September 1998 and her keel was laid down on 27 August 2004. She was commissioned on 5 May 2007. In July 2009, she changed home port from Groton, CT (Submarine Group Two, Submarine Squadron Two) to Pearl Harbor, HI (Submarine Squadron One). History January 2008 – maiden deployment. May 2008 – post-shakedown availability. Coast Guard Meritorious Unit Commendation for their work in disrupting drug trafficking from 20 February to 17 April 2008. 10 July 2009 – The sub transits the Panama Canal en route to new homeport at Pearl Harbor. 23 July 2009 – The sub reaches Pearl Harbor. August 2010 – The boat leaves for her first Western Pacific cruise, under temporarily assignment to Seventh Fleet, making her the first Virginia-class submarine to enter the Western Pacific.